Locations

Serving Customers across America

Founded thirty years ago in Colorado, Blackeagle now works with energy customers from the Rocky Mountain region, to the Gulf Coast, across the Great Plains and several Appalachian states.

Blackeagle Headquarters

230 Commerce Dr.
Berthoud, Colorado 80513

Nebraska Field Office

3502 2nd Avenue
Kearney, NE 68845

Oklahoma Field Office

305 Nw 5th St Ste 2120
Oklahoma City, OK 73102

Texas Field Office

407 Industrial Blvd
Borger, TX 79007
image/svg+xml

Explore some of our past projects across the United States.

Tight timeline, protected wetland, 600-ft. elevation prove the power of planning.


The Project:

New 1.5 mile natural gas transmission line. Northwest Colorado.

The Challenge:

Very accelerated timeline, compressing years of work into just a few months. Environmental concerns, elevation differences, horizontal directional drilling into bedrock.

The Solution:

Site analysis conducted with the customer’s engineering team. Contracted with an environmental expert specializing in horizontal drilling. Use of special drills with steel casing, allowing for horizontal drilling without disturbing the surrounding ground.

Read the Case Study >

Renewable natural gas (RNG) pod with anaerobic digestors.


The Project:

Renewable natural gas (RNG) pod with anaerobic digestors.

The Challenge:

Simultaneous operations of multiple construction disciplines, ranging from electrical contractors, civil contractors, anaerobic digestor tank construction, and others. Leading the way for the others who had not worked on renewable projects before. Supply chain delays.

The Solution:

Working closely with the customer’s engineering team, assembly of specialty equipment, custom fabrication, cable trays, painting, and more. A high degree of communication intelligence to overcome suplly chain delays.

Read the Case Study >

No past projects have been found for the state of

We'll be your partner
from start to finish

Contact Us